  • ROADWAYS - Street signs installed on 2/3 of the intersections
  • CHAPEL – Roof tightened up and broken slates replaced
  • CHAPEL – Brickwork and granite steps pointed and sealed
  • CHAPEL – Shed entry to basement repaired and painted
  • CHAPEL – Ceiling and walls repaired and painted along with vestibule ceiling
  • CHAPEL – Floor sanded and refinished
  • CHAPEL – Added two new sconces to the walls and a light in the vestibule
  • ROADWAYS – Repaved intersection of Morse Ave., Cross Ave. and Hewitt Cir.    
  • ROADWAYS – Two manholes raised to road level on Greenwood Avenue
  • TREES- Eight trees removed along easterly property line – Expense shared with neighbors
  • TREES – Two dead trees removed
  • WATER SYSTEM - Spigot Stanchions installed (18)
  • CHAPEL - Carpet Runner has been installed
  • CHAPEL - Chairs in the apse area have now been re-upholstered
  • SPRING STREET ENTRANCE - The Spring Street Entrance was repaved to do away with the large puddle that occurred after every rain storm. Also the intersection of Greenwood Avenue and Pleasant Avenue was repaved.